Wednesday, November 16, 2011
Final Project- Dog Animatic Still Images
These are all of the still drawings from the storyboard timed out in a basic animatic; camera moves not included yet. Some additional shots may end up being added at the beginning, and in certain places (when the dog buries the ripped up ball).
Thursday, November 10, 2011
Final Project- Schedule
For my final project I will be making an animatic of the storyboards I did for the Story Project. Here is the schedule for the animatic.
November 17th- Have all still images timed out, and begin separating drawings into layers so that they are ready to move around.
November 24th- Finish separating the drawings, and have the first two scenes timed out and moving with camera moves.
December 1st- Scenes 3 and 4 will be timed out with camera moves.
December 8th- Scenes 5 and 6 timed out with camera moves.
December 15th- Add in sound effects, and/or additional music, shading, final adjustments.
November 17th- Have all still images timed out, and begin separating drawings into layers so that they are ready to move around.
November 24th- Finish separating the drawings, and have the first two scenes timed out and moving with camera moves.
December 1st- Scenes 3 and 4 will be timed out with camera moves.
December 8th- Scenes 5 and 6 timed out with camera moves.
December 15th- Add in sound effects, and/or additional music, shading, final adjustments.
Thursday, November 3, 2011
Subscribe to:
Posts (Atom)